Concrete Calculator

Get the right amount of concrete for your slab or footing. Includes bag estimates and total weight.

Shape

Slab dimensions

m
m

Depth / thickness

How will you get the concrete?

Pour and waste settings

How many of these are you making?: 1 | Extra: 5%

Volume (with extra)

2.100m³

Volume per section
2.000 m³
Volume (before extra)
2.000 m³
In litres
2100 L
Bags (20 kg pre-mixed)
234
Total weight (approx.)
5040 kg

How concrete calculations work

Any concrete calculator works from the same principle: volume equals area multiplied by depth, so figuring out how much concrete you need always starts with the slab or footing dimensions.

For a rectangular slab or footing, multiply length × width × depth to get the volume in cubic metres. For a circular base, such as a round pad for a clothesline or post, calculate the area using π × radius² (half the diameter, squared, multiplied by 3.14159) and then multiply by depth.

Once you have the raw volume, add a small extra margin to account for spillage, uneven ground, and slight variations in your formwork. The result is converted to litres (1 m³ = 1,000 litres) so you can see the quantity in practical terms. For a thin levelling layer over an existing slab, the screed calculator covers that case instead.

Finally, you'll see the number of 20 kg pre-mixed bags you'd need, each bag yields roughly 0.009 m³ of mixed concrete, and the total weight using standard concrete density of approximately 2,400 kg per cubic metre.

How to measure your project

Start by marking out the area with string lines or spray paint so you have clear edges to measure. Use a tape measure to record the length and width in metres.

For footings and trenches, measure the trench width and depth at several points, since the bottom is rarely perfectly even. Use the deepest measurement to avoid running short. For circular bases, measure the full diameter across the widest point.

Always measure depth from the bottom of the excavation to your intended finished surface level, not just from existing ground level. Check that depth is consistent across the area by measuring at each corner and in the centre.

Write everything down before you start. It's much easier to re-check measurements than to fix a pour that came up short.

For large pads, divide the slab into smaller imaginary rectangles and measure each one separately so a single mistake on a long wall does not propagate across the whole pour. Mark fall and drainage levels at the corners where the pour ends, because a 1 in 80 slope across a 4 metre patio adds a noticeable triangular wedge to the volume that a flat-slab concrete calculator will miss. When working out how much concrete is needed for footings, also note the trench width at the base versus the top: shovel-cut trenches narrow toward the bottom, so the average width is usually a few centimetres less than what you read at ground level. Finally, factor in a 5 to 10 per cent allowance for spill, irregular subgrade and bag-edge wastage when ordering by the bag rather than ready-mix.

Common mistakes to avoid

Underestimating depth is the most frequent error. Ground is rarely perfectly level, so if your excavation varies by even 20 mm across a large slab, the extra volume adds up quickly. Always measure at the deepest point.

Forgetting an extra margin is another common problem. Concrete spills, sticks to tools, and fills low spots you didn't notice. Allow at least 5 to 10% extra.

Ordering too little is worse than ordering too much. Running short mid-pour leaves you with a cold joint that weakens the structure, and you can't easily pause and come back later.

Finally, confusing volume units catches people out. One cubic metre equals 1,000 litres. Mixing up m³ and litres when placing an order can mean getting a fraction of what you actually need. For the levelling layer that goes on top of the cured slab, a screed calculator handles the bag count separately.

A fifth mistake is treating a concrete calculator output as an exact figure: ground conditions, formwork wastage and bag-edge spill all push real consumption above the theoretical volume, so always order a fraction over the calculated quantity. When working out how much concrete is needed for fence-post footings or stepped trench bottoms, also remember that uneven excavation walls add volume that a flat geometric model never sees.

Frequently asked questions

How much waste should I allow for concrete?

Allow 5 to 10% extra for waste on most projects. If you're pouring on uneven ground, into rough-sided trenches, or working in a confined space where spillage is likely, go closer to 10%. It's always better to have a small amount left over than to run short during a pour.

How many bags of concrete do I need?

One standard 20 kg bag of pre-mixed concrete yields approximately 0.009 m³ when mixed. Divide your total required volume (including waste) by this figure to get the number of bags. For anything over about 40 bags, consider ready-mix delivery instead.

How thick should a concrete slab be?

For garden paths and light foot traffic, 75 to 100 mm is typically sufficient. For driveways and garage floors that need to support vehicle weight, aim for 100 to 150 mm. These are general guidelines, so always check local building requirements for structural slabs or load-bearing foundations.

What is the difference between pre-mixed and ready-mix concrete?

Pre-mixed concrete comes in bags that you mix with water yourself, which is practical for small jobs under about 0.5 m³. Ready-mix concrete is batched at a plant and delivered by truck, which is more cost-effective and consistent for larger pours. Your bag estimate is based on pre-mixed, so you can decide which option suits your project size.

How heavy is concrete?

Standard mixed concrete weighs approximately 2,400 kg per cubic metre. That means even a small slab of 0.5 m³ weighs around 1,200 kg. Plan your transport and handling accordingly. A single 20 kg bag is manageable, but a full pallet of bags or a ready-mix delivery requires proper access and equipment.