Screed Calculator

Find out exactly how much floor screed to buy. Bags, kilograms, drying time, and underfloor heating cover are all factored in.

What are you pouring?

Floor dimensions

m
m

Finished thickness

mm

Traditional floors are typically 65 to 75 mm. Liquid screeds sit around 40 to 50 mm. A bonded self-levelling top-up is 3 to 15 mm.

Bag size

Waste, bag price, pipe diameter

5% waste

Bags to buy

123bags · 25 kg

Area covered
20.00 m²
Volume (with waste)
1.470 m³
Total mass (mixed)
2940 kg
m2 per bag
0.17 m²
Drying time
90 days

How screed calculations work

Start with your floor area: multiply the length by the width to get the square metres you need to cover. If your room isn't a simple rectangle, split it into rectangles, measure each one, and add the areas together. The same area drives a concrete calculator if the structural slab below the screed still needs pouring.

Next, multiply the area by the finished screed thickness (in metres, so a 70 mm pour is 0.07 m). That gives you the volume in cubic metres. Add your waste percentage on top to cover spillage, uneven substrate, and slight over-pours. Five percent is typical for a flat, bounded slab.

Converting volume to bags depends on the bag yield. A 25 kg bag of traditional sand-cement pre-mix yields around 0.012 m3 once mixed, so one bag covers about 1.2 m2 at 10 mm. A 40 kg bag scales to around 0.019 m3. A self-levelling 25 kg bag covers roughly 6 m2 at 3 mm. Mass uses screed density: 2000 kg per m3 for sand-cement, 2100 kg per m3 for anhydrite.

How to measure your floor

Use a tape measure and record the length and width in metres. Measure at several points along each wall because buildings are rarely square. Use the largest figure for each dimension so you don't come up short.

For L-shaped rooms or rooms with alcoves, break the floor into rectangles, measure each separately, and add the areas together. If you've got underfloor heating pipes already clipped to the insulation, measure the finished screed depth from the top of the pipe, not from the insulation.

Check the floor for high spots before you order. A screed evens out small dips, but a substrate that varies by 20 mm across the room means more material than the simple multiplication suggests. Walk the floor with a straight edge and note the low points.

Write the door-threshold heights on the same sketch, because the finished screed must sit flush with adjoining floors rather than ride proud of them. For underfloor heating, the minimum cover above the pipe varies from 30 to 45 millimetres depending on screed type; this figure drives the final thickness and therefore how much screed you actually need to order. A reliable screed calculator works best with all of these numbers, so jot the room plan, the cover depth and the perimeter expansion strip onto one piece of paper before you head to the merchant. In refurbishment work on timber joists, also check the structural load: a wet screed weighs roughly 40 to 50 kilograms per square metre once poured.

Common mistakes to avoid

Under-ordering is the big one. A screed pour has to go down in a single session, so running short at 90% coverage leaves you with a cold joint that weakens the finished floor. A 5% to 10% waste margin is a cheap insurance policy.

Forgetting the underfloor heating minimum cover catches people out. DIN 18560 says you need 45 mm of sand-cement or 35 mm of anhydrite above the top of the pipe. On a 16 mm pipe that's a total pour depth of 61 mm or 51 mm respectively, not the nominal screed thickness you see in product brochures.

Pouring too thin causes cracking. A traditional screed needs at least 50 mm unbonded or 65 mm floating. An anhydrite liquid screed needs 30 to 35 mm minimum. Don't drop below those numbers to save a bag or two.

Finally, drying time is slower than people expect. A 70 mm traditional pour takes around 90 days under typical indoor conditions. Plan your tiling or timber install around that, not around the day the pour hardens. The same area then drives a tile calculator or a flooring calculator for the finished surface above the screed.

Frequently asked questions

How much screed do I need per square metre?

At 50 mm of traditional sand-cement screed, one square metre needs 0.05 m3 of material, about 100 kg. That's roughly 4.2 bags of 25 kg or 2.6 bags of 40 kg per m2 in raw material, rounded up when you reach the checkout. Liquid anhydrite is slightly heavier at about 105 kg per m2 for the same thickness.

How many bags of screed do I need for 20 m2?

For a 20 m2 floor at 70 mm thick traditional screed, you need about 1.4 m3 of material plus a 5% waste margin, so 1.47 m3. A 25 kg bag yields 0.012 m3 mixed, so that's 123 bags. At 40 kg per bag, you'd need 77 bags. Always round up to the nearest full bag; you can't split one.

What's the minimum screed thickness?

A traditional sand-cement screed needs at least 25 mm bonded, 50 mm unbonded, or 65 mm floating. A liquid anhydrite screed needs 25 mm bonded, 30 mm unbonded, or 35 mm floating. A bonded self-levelling top-up can go as thin as 3 mm, but it's not a substitute for a structural screed.

How long does screed take to dry?

A traditional sand-cement screed dries at roughly 1 mm per day up to 50 mm, then slows to about 2 days per extra millimetre. A 75 mm pour takes around 100 days. Liquid anhydrite dries slightly faster up to 40 mm. Temperature, humidity, and ventilation all push the time up or down, so a reliable rule is to test moisture with a calcium chloride or hood test before laying the finished floor.

What screed should I use over underfloor heating?

Both traditional sand-cement and liquid anhydrite work over UFH. Anhydrite is the popular choice in Germany and the Netherlands because it spreads evenly and needs less cover over the pipes (35 mm vs 45 mm for sand-cement). Always keep the minimum cover above the pipe top and let the screed dry fully before running the heating curve.

Other Calculators